We made more progress on Elden's big boy room last night:
I still have half the vertical strips to paint still and I was hoping to do that after work before Elden came home from Jon's parent's today but he woke up with a 103.2-degree fever so I'm at home with an unhappy boy and will not be making any progress in the room this day...

to do:
-paint the ceiling 
-prime the trim x2
-prime the doors x2
-paint the trim
-paint the doors
-spackle  
-caulk
-remove the existing light fixture
-install a ceiling fan
-install the faux wainscoting (half done)
-caulk the faux wainscoting (half done)
-paint the faux wainscoting (half done)
-replace the outlet covers (2) and lightswitch (1)
-paint the upper half of the walls
-give a facelift to the curtain rods
-install new furniture
-decorate the walls with the shelves and wall art we have